BOAO Product Catalogue
Four-Level Above-Ground Lift-and-Slide Parking System
Multi-level Puzzle Parking System
Four-Level Above-Ground Lift-and-Slide Parking System
4-level lift-and-slide storage uses vacant positions to move platforms to the access level.
- 4 above-ground levels
- Lateral positioning and vertical storage
- Button operation, optional IC card
- Site, vehicle and fire-protection requirements checked
System Overview
Working Principle
Platforms on the ground and intermediate levels move sideways to create a vacant position for the target platform. This 4-level above-ground configuration uses wire-rope lifting. Capacity, vehicle limits and installation height depend on the model and site.
Product Advantages
Key Characteristics
Lateral positioning and vertical storage
Button operation, optional IC card
Site, vehicle and fire-protection requirements checked
Configuration Reference
Technical Specifications
- Model series
- PSH4
- Capacity for N columns
- 4N−3 (N = columns)
- Lift motor
- 2.2 kW
- Lift speed
- 4–6 m/min
- Power
- Three-phase 380 V 50 Hz
- Levels
- 4 above ground
- Lifting method
- Motor-driven wire rope
- Traverse motor
- 0.2 kW
- Traverse speed
- 8–10 m/min
- Operation
- Buttons / optional IC card
Final product parameters and configuration must be confirmed for the specific project.
Selection Guidance
Four-level storage
PSH4 uses four above-ground levels, motor-driven wire-rope lifting and lateral movement to open a route for a selected platform. The level count and lifting method distinguish this reference arrangement from the chain-lifted two- and three-level models in the same range.
Compare capacity and headroom
For N columns, the reference capacity is 4N-3 spaces. Use it to start comparing layouts, then check the actual clear height, column positions and access area in a project drawing. Vehicle heights and building obstructions can influence the chosen arrangement.
Plan the installation
Share the site plan and section, desired capacity, vehicle envelope and weights, entrance position and anticipated parking pattern. Discuss electrical supply, fire-protection conditions and operating controls with the project team before selecting the equipment configuration and establishing a final space count.