BOAO Product Catalogue
Intelligent Lift-and-slide Parking System
Multi-level Puzzle Parking System
Intelligent Lift-and-slide Parking System
Flat platform edges and roller alignment support new systems and modernization.
- Flattened platform edges
- One-button roller alignment
- New systems and modernization
System Overview
Working Principle
Flattened platform edges reduce barriers between adjacent platforms for angled reversing. A roller system detects wheel misalignment and supports one-button correction. Two-level, multi-level, high-rise and partial or complete modernization layouts depend on the existing equipment and site.
Product Advantages
Key Characteristics
One-button roller alignment
New systems and modernization
Configuration Reference
Technical Specifications
- Vehicle length / width
- ≤5200 / ≤1950 mm
- Vehicle weight
- 2350 kg
- Rated power
- 2.2 kW
- Vehicle height
- 2050 / 1550 mm (space-dependent)
- Lift speed
- 4–6 m/min
- Power
- 380 V
Final product parameters and configuration must be confirmed for the specific project.
Selection Guidance
Platform access and alignment
This Parking System uses flattened platform edges to reduce barriers between adjacent platforms for angled reversing. A roller system detects wheel misalignment and supports one-button correction. Review these features in the context of the actual vehicle approach and the intended users.
New layouts and modernization
Two-level, multi-level and high-rise layouts, as well as partial or complete modernization, are described for this system. For an existing installation, the scope depends on the equipment and site. The proposed replacement or integration should be assessed with the original layout and operating conditions.
Prepare a technical review
Provide vehicle dimensions and weights, a plan and section, target spaces and the access arrangement. For modernization, include drawings, equipment details and photographs of the current installation. Confirm compatibility, the proposed extent of work, power and fire-protection requirements during project planning.